Gree GMV5E Series Service Manual page 275

Dc inverter vrf units
Table of Contents

Advertisement

GREE
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected.
Step
9. Check and then
install the front
panels.
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected.
Step
1. Loosen the hooks at
the bottom of the
electric box and the
screws.
2. Remove the electric
box.
GMV5E DC INVERTER VRF UNITS SERVICE MANUAL
Compressor
Diagram
Four-way valve
Diagram
271
Operation Procedure
●Check various parts and connecting
lines.
●If no problem is found, hook the
front panels and tighten the screws.
Operation Procedure
● Remove the upper and lower front
panels.
● Loosen the hooks at the bottom of
the electric box.
● Use a screwdriver to unscrew the
electric box.
●Disconnect internal and external
connecting lines of the electric box.
●Protect the internal parts during the
disassembly.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents