Gree GMV5E Series Service Manual page 120

Dc inverter vrf units
Table of Contents

Advertisement

GREE
"
" indicates that commissioning is not passed on the phase and troubleshooting is required
(after troubleshooting, the unit automatically enters the next step if no "OK" exists or click "OK" to enter
the next step). Click "
references for troubleshooting. Click "Close" to close the information.
During commissioning, click "Stop" to stop commissioning and then click "Start" to continue
commissioning till commissioning ends. "Back" and "Skip" are provided in "10 ODU Valves Check Before
Startup". When an exception occurs in step 10, click "Back" to return to step 9 and then click "OK" in step
9 to perform commissioning again for step 10. If a U6 fault (valve exception) occurs in step 10, users can