Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected.
Step
7. Check and install the
front panels.
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected.
Step
1. Loosen the hooks at
the bottom of the
electric box and the
screws.
2. Remove the electric
box.
GMV5E DC INVERTER VRF UNITS SERVICE MANUAL
Electric expansion valve
Diagram
Oil separator
Diagram
275
Operation Procedure
●Check various parts and
connecting lines.
● If no problem is found, hook the
front panels and tighten the
screws.
Operation Procedure
● Remove the upper and lower
front panels.
● Loosen the hooks at the bottom
of the electric box.
● Use a screwdriver to unscrew
the electric box.
●Disconnect internal and
external connecting lines of the
electric box.
●Protect the internal parts during
the disassembly.