GE AKTA GO Operating Instructions Manual page 98

Table of Contents

Advertisement

7 Maintenance
7.4 Replace the main fuses
Step
2
3
4
5
6
7
1
98
Action
Use a small flat-bladed screwdriver to prise open the fuse holder cover on
the power inlet.
Pull the fuse holder out of the mains connector panel by hand.
Remove the fuses from the fuse holder.
Fit new fuses of the same size and rating
Replace the fuse holder in the power inlet.
Reconnect the power cord.
Fuse rating: T4AL 250 V, 5 × 20 mm
NOTICE
When replacing fuses, make sure that the fuse holder
is pushed fully into position.
1
.
ÄKTA go Operating Instructions 29360951 AC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents