Step
1
2
3
ÄKTA go Operating Instructions 29360951 AC
Action
Insert the waste tubing from all installed modules in a suitable vessel.
Cut the waste tubing to appropriate length. It is important that the tubing
is not bent.
Note:
If the tubing is too short, replace it with new tubing. Do not lengthen the tubing
as this might cause obstruction of the tubing.
Fasten all waste tubing to the waste vessel.
4 Installation
4.2 Hardware installation
4.2.2 Install waste tubing
47
Need help?
Do you have a question about the AKTA GO and is the answer not in the manual?
Questions and answers