GE AKTA GO Operating Instructions Manual page 47

Table of Contents

Advertisement

Step
1
2
3
ÄKTA go Operating Instructions 29360951 AC
Action
Insert the waste tubing from all installed modules in a suitable vessel.
Cut the waste tubing to appropriate length. It is important that the tubing
is not bent.
Note:
If the tubing is too short, replace it with new tubing. Do not lengthen the tubing
as this might cause obstruction of the tubing.
Fasten all waste tubing to the waste vessel.
4 Installation
4.2 Hardware installation
4.2.2 Install waste tubing
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents