Required Materials - GE AKTA GO Operating Instructions Manual

Table of Contents

Advertisement

4.1.6

Required materials

Introduction
This section describes the materials required for the installation and operation of the
ÄKTA go instrument.
Solutions
The solutions listed in the following table are required during the installation procedure
and should be provided at the installation site.
Buffer/solution
Distilled water
1.0% acetone and 1.0 M
NaCl in distilled water
20% ethanol in distilled
water
ÄKTA go Operating Instructions 29360951 AC
Required volume
Scope of use
1 L
System test, Pump test, and Mixer
test
If applicable, Fraction Collector
F9-R test, and/or Column Valve
V9-C test
1 L
System test and Mixer test
150 mL
Priming of the pump rinsing sys-
tem
4 Installation
4.1 Site preparation

4.1.6 Required materials

41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents