GE AKTA GO Operating Instructions Manual page 67

Table of Contents

Advertisement

Step
3
4
5
6
ÄKTA go Operating Instructions 29360951 AC
Action
Under Flow, enter 5 mL/min and click Set.
Result: A system flow starts.
Connect a 25 to 30 mL syringe to the purge valve of the left pump head.
Open the purge valve by turning it counter-clockwise about one and a half
turns. Draw liquid slowly into the syringe, at a rate of approximately 1 mL
per second, until there are no air bubbles in the liquid that reaches the sy-
ringe.
Close the purge valve by turning it clockwise. Disconnect the syringe and
discard its contents.
5 Prepare the system for a run
5.2 Prime inlets and purge pump heads
67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents