GE AKTA GO Operating Instructions Manual page 66

Table of Contents

Advertisement

5 Prepare the system for a run
5.2 Prime inlets and purge pump heads
Purge the pump and confirm it
is free from air
Follow the steps below to purge the two pump heads of the pump so that they are free
from air.
Step
1
2
66
Action
In the Process Picture pane, click Injection valve and select Waste.
Result: The injection valve switches to waste position and opens inlet A.
In the Process Picture pane, click Inlet Valve and select the inlet that will be
used at the beginning of the run.
Result: The inlet valve opens the selected inlet.
ÄKTA go Operating Instructions 29360951 AC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents