Kohler EKOZD Series Service page 254

Marine generator sets
Table of Contents

Advertisement

13.6 Generator Management Detailed Functional Sequence
Figure 13-15 Generator Management Functional Sequence
Generator Management has four basic functional
modules which fit the architecture illustrated in
Figure 13-15. Each module has minimal interaction with
other modules, to allow simplified interaction scenarios
and functional descriptions.
13.6.1 Order Selection Logic
The order is only changed if a change is required. The
criterion to determine if a change is required depends on
the
order
selection method of
Management system.
254 Section 13 Generator Management Information
Manual Mode Order Update Required Logic
The order will attempt to re-negotiate if any of the
following conditions come true:
D
can be caused by changing the number of generators
connected to the PGEN network, or by changing
settings in a single controller while it was not
connected to the PGEN network.
D
the Generator
The order is not valid (unique and sequential). This
A user has manually adjusted the order.
TP-6953
7/19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents