Serial Communication Test Set-Up; Equipment; Pc Set-Up; Power Supply Set-Up - TDK-Lambda GENESYS GEN 2400W Series Technical Manual

1u programmable dc power supplies
Hide thumbs Also See for GENESYS GEN 2400W Series:
Table of Contents

Advertisement

7.9 SERIAL COMMUNICATION TEST SET-UP

Use the following instructions as basic set-up to test the serial communication operation.
7.9.1

Equipment:

PC with Windows Hyper-Terminal, private edition, software installed, Genesys
7.9.2

PC Set-Up:

1. Open Hyper Terminal.........................
2. Enter a name
3. Connect to.......................................
4. Configure port properties:
5. Open Properties in the program
6. Setting: ASCII Set Up
Select Echo characters locally, select send line ends with line feed. On some PC systems, pressing the
number keypad "Enter" will distort displayed messages. Use the alphabetic "Enter" instead.
7.9.3

Power Supply Set-Up:

1. Connect the power supply to the PC using the RS-232 cable.
2. Set via the front panel: Baud Rate: 9600, Address: 06.
3. Set via the rear panel: RS-232/RS-485 to RS-232 (refer to Section 4-4).
7.9.4

Communication Test:

1. Model identification:
PC write: ADR 06
Power supply response: "OK"
2. Command test:
PC write: OUT1
Power supply response: "OK"
PC write: PVn
Power supply response: "OK"
PC write: PCn (for values of "n" see Tables 7-3, 7-4 and 7-5)
Power supply response: "OK"
The power supply should turn on and the front panel display will indicate the actual Output voltage and the
actual Output current.
New Connection.
Direct to Com1 or Com2
Bits per second......9600
Data bits...............8
Parity...................None
Stop bits...............1
Flow control..........None
File......................Properties
71
83-517-000 Rev. A
TM
Power supply, RS-232 cable.

Advertisement

Table of Contents
loading

Table of Contents