Spin Process - Renesas R8C Series User Manual

Washer platform
Hide thumbs Also See for R8C Series:
Table of Contents

Advertisement

RSSHEUM0003 - 0101
Rev.1.00
b), Rinse-Spin type:
Washing program starts with spin process, and at the same time, the inlet valve open and close with
35/30 seconds cycles (for details, please refer to the program table).

3.2.5 Spin process

Spin process has four steps, there are intermittent spin, continuous spin, inertial spin and bake, and
in some program the spin process may be with the inlet on (rinse-spin type). During spin running, if
lid is open, platform will alarm and run the error processing program. Below is the description of the
spin process.
a), In intermittent spin, the motor run clockwise with 4s/3s on/off cycles.
b), In continuous spin, the motor run clockwise continuously.
c), Spay spin is the process that during spin, the inlet valve open and close with 35/30 seconds cycles
(for details, please refer to the program table).
d), In inertial spin, the motor is turned off with drain valve on, and the tube keep running by the
inertial motion. If the lid is open, this process paused but it does not need to judge the balance status.
e), While brake occurs, drain valve and drain motor are turned off, this process lasts for 5 seconds,
the tube is braked by the mechanical part.
f), While spin running, the washing motor keep turned off for 7 seconds after the drain motor and
valve switched on for waiting the mechanical parts being ready.
g), During spin running, if lid is open or unbalance happen, platform will alarm and run the error
processing program. At this time, washing motor is stopped and drain motor and valve is switched
off, and the tube is braked by mechanical parts.
h), If unbalance happen, the program will stop spin process and inlet to user setting water level value,
then starts wash process with balance stream for 60 seconds, after that, washing program will
resume drain and spin process. If unbalance happen again after 2 times adjusting, platform will
alarm and run the error processing program. During unbalance adjusting, the program left time will
be increased accordingly.
Renesas System Solution (Beijing) Co., Ltd, Shanghai Branch
Unit 207 AZIA Center, No.1233 Lujiazui Ring Road, Pudong District, Shanghai, China
Tel: (86-21) 6888-0556
Fax: (86-21) 6888-0559
Page 34
Zip: 200120

Advertisement

Table of Contents
loading

This manual is also suitable for:

R8c 2aR8c 2bR5f212acsnfaR5f212bcsnfa

Table of Contents