Send Test Email Msg - YSI MultiDO 5400 User Manual

Monitor, control, & alarm instruments
Table of Contents

Advertisement

7.
Verify that the Termination Relay is enabled on the first and last device
on the network.
For master node: Press
at master submenu. At assign slaves menu,
8.
select the slave address configured in step 5 above. Press enter. Enable
one slave at a time using
9.
Press
to save configuration and return to Run Screen.
10. Each slave should be tested one by one. Insert network termination
strip and apply power to the master and the last physical device on the
network. If the master is not the first or last physical device on the net-
work, apply power and insert network terminal strip on the master and
on the first and last physical devices on the network. Refer to network
wiring instructions for additional information - page 60. Testing for
proper wiring and configuration can be done one of two ways:
A. After performing step 9, wait at least 30 seconds and then reenter the
Communication Master submenu. If serial number of the slave is displayed
next to the slave address number, the communication network is wired and
configured correctly.
YSI 5X00
Configuring the 5X00
softkeys.
98
OR
B. After performing step 9, wait at least 30 seconds and then poll the slave
node using Aqua Manager. Follow AquaManager online Help to Insert
node into AquaManager network. AquaManager will obtain node configu-
ration, current data and any logs if the node network is wired and config-
ured correctly.
Notes:
-
An Event and General Alarm (if enabled) will occur if, after ten queries, an
enabled slave does not respond to the Master.
\
-
Configuring a 5X00 as a Master overrides any slave configuration that had
been previously saved.
-
Slave alarms (slave alarm at master and 5X00 email alarms) will not occur if
slave node serial number is not recognized at master node at steps 10. A or
10. B above.
Termination Relay
Menus → System → Communications → Network →Termination Relay
The termination relay must be enabled on the first and last 5X00 on a network. All
other devices should have the termination relay disabled.

Send Test Email Msg

Menus → System → Communications → Send Test Email Msg
Send a test email to verify proper configuration of ethernet menus. If necessary
confirm all ethernet menus configuration starting on page 92. Test emails are
only transmitted from configured master 5X00s.
Notes:
-
Test emails are sent to all configured email address.
-
Exit to Run Screen is required before the test email is sent.
Configuring the 5X00
YSI 5X00
99

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multido 5500d-01Multido 5500d-02Multido 5500d-04

Table of Contents