Installation Suggestion "White Tub; Preparing For Installation - Kessel Pumpfix F Instructions For Installation, Operation And Maintenance

Backwater pumping station
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 26
3.3

Installation suggestion "white tub"

Schematic
illustration
1 Pumpfix F
2 Extension section with central flange for installation in impermeable concrete, art. # 83075
a Tiles
b Seal
c Screed
d Concrete floor
e Insulation
3.4

Preparing for installation

For smooth installation and operation, please heed the following:
- Make sure there is a sufficient gap to the wall or objects for maintenance work to be carried out.
- Maintain a stilling section before and after the Pumpfix F (min. 1 m).
- Route a cable conduit (DN70) from the Pumpfix F to where the control unit is installed. Changes of direction must
be made using 45° bends only.
When selecting the installation location, take the position for the control unit into consideration:
The electric components have cable lengths of 5 metres, extension sets are available as optional extras. For the
pump to be lifted out of the drain body completely for maintenance work, there must be a sufficient length of pump
connection cable within the drain body.
The cable conduit serves to vent the space above the pump. For this reason, it must not be sealed airtight.
A socket (safety socket, 230 V) is also required for the control unit.
- If a vent pipe is installed instead of the venting valve, it must be routed to the drain body.
2019/12
BWS*
Installation
a
b
c
d
2
1
Fig. [9]
f Insulation
g Clean layer
h Control unit
i Cable conduit
BWS* Design flood
37 / 152
h
i
e
f
g
010-843

Advertisement

Table of Contents
loading

This manual is also suitable for:

010843

Table of Contents