Underground Installation (White Tub); Ensure Ventilation - Kessel Pumpfix F Instructions For Installation, Operation And Maintenance

Backwater pumping station
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 26
3.8

Underground installation (white tub)

Insert the sealing gasket <37> in the drain body <1> and make sure the
sealing gasket is in place correctly. Then grease the upper side of the
sealing gasket. Push the extension section central flange <33> in
and move it into position.
3.9

Ensure ventilation

With exposed installation, make sure that the pre-assembled
ventilation valve incl. activated carbon filter <11> is screwed tightly.
For use within a chamber, dismantle the ventilation valve and route
the ventilation hose via the backwater level, see the section below.
3.9.1
Connecting the venting pipe
In order to ensure the function of the system in chamber installation
in case of flooding, the venting pipe is to be laid at least 10 cm above
backwater level.
The venting pipe must be routed in such a way that it
does not hinder access for maintenance purposes nor the other
pipe connections (pressure pipe / cable conduit pipe).
- Screw the venting valve <11> out of the pump unit
<20> (see Fig. [17]).
- Fix the venting pipe to the connection <12> on the venting valve (1/2 inch).
Make sure the seal between the ventilation pipe and the drain
body fits properly.
010-843
Installation
40 / 152
33
37
1
Fig. [16]
11
20
12
Fig. [17]
2019/12