13.4 OPERATION STAGES (SHOWN ON THE SCREEN)
OFF
Boiler is switched off
S0
Initial fan blowing, waiting for grate position check
Not used
S1
S2
Initial pellet filling
S3
Waiting for flame to appear
Electric heater working after flame appears
S4
S5
Flame developing stage
SP1
Stabilisation stage 1
Stabilisation stage 2
SP2
SP3
Stabilisation stage 3
SP4
Stabilisation stage 4
Stabilisation stage 5
SP5
S6
Additional flame developing stage
D0
Power D0
Power D1
D1
D2
Power D2
D3
Power D3
Power D4
D4
D5
Power D5
D6
Power D6
Shuting down stage
S7
1st stage of shuting down stage, waiting for flame to dissapear and additional blowing for
set time, after which S7-2 stage starts. Flue gas fan works (rpm) according to stage from
S7-1
which boiler entered S7-1 stage
2nd stage of shutting down stage. Final flue gas fan blowing at. max rpms until factory
S7-2
set time passes. After this stage grate cleaning stage starts (C0) and enters S7-3 stage.
Burner don't work/standby/pause. Boiler waits demand for start.
S7-3
Stage after power supply failure and power supply return, el. heater is started and waits
PF0
for flame to appear (if flame appears -> PF1, if flame don't appears -> PF4)
PF1
El. heater switches off and enter PF2
PF2
Flame developing stage, enter PF3
PF3
Waits for flame disappearing, enter PF4
Final flue gas blowing, boiler restarts or enters OFF stage, depending of the stage when
PF4
power supply failure accurs
C0
Grate cleaning stage