Autotest Using Two-Way Testing - Black Box Fiber Meter Manual

Table of Contents

Advertisement

FIBER METER

5.5 Autotest Using Two-Way Testing

1. From the Autotest Optical Power Measurements
display screen (see Figure 5-8), press the F2 button
on the Main Unit to start Autotest loss
measurements. A message on the Autotest
Summary screen will prompt you to swap the
connections when the first step of the Autotest is
completed. See Figure 5-13.
2. Swap the cables and press the F4 button to
continue with the second step of the Autotest. The
Autotest Summary screen is displayed at the
completion of the Autotest.
3. Press the F1 button to restart the Autotest
measurement.
54
Figure 5-13. Autotest Summary screen.

Advertisement

Table of Contents
loading

Table of Contents