Control Panel; Preparing Rake For Transport - SaMASZ TANGO 730 Operator's Manual

Two-rotor rake
Hide thumbs Also See for TANGO 730:
Table of Contents

Advertisement

5.1.1. Control panel

Controller (Fig. 9) enables switching the rake's working units to working position (lowering)
and transport position (lifting). During the machine operation, if diode (1) is lit the sequential lifting
and lowering of working units function is enabled. Button (C) is for switching between the panel
functions. Once button (C) is pressed the diode (1) goes off, a diode (2) will light up to indicate
deactivation of sequential lifting and lowering function and thus activation of folding the machine
for transport and unfolding it for operation function. Once this option is enabled the working units
will fold and unfold steadily. Note: once diode (2) lights up the function remains active for 60
seconds. This time is sufficient to fold the machine to transport position or unfold it to working
position. As the 60 s time elapses the panel will go to sequential operation mode.

5.2. Preparing rake for transport

NOTE:
Switching the machine from working to transport position, and the other way
round can only be done on an even and stable ground. Prior to starting any
works make sure that nearby the machine there are no unauthorized persons
exposed to being crushed.
In order to prepare the rake for transport and- drive on a road-:
due to safety reasons, before setting the rake to transport position turn off the PTO shaft; raking
arms cannot be in motion,
lift safety guards to transport position,
Instruction manual
S
W
Fig. 8. Rake mounted on tractor
Fig. 9. Control panel
- 14 -
Two rotor rake
TANGO

Advertisement

Table of Contents
loading

Table of Contents