Installation
3.2
Control terminal
strip X1
Power circuit
terminal strip X2
Operator
Control terminal
stripX1
Power circuit
terminal strip X2
GB - 12
Connection of the power circuit
Assembly groups and terminals strips of COMBIVERT M4
L1
L2
L3
PA PB u v w
START
ENTER
F/R
STOP
Warnung:
Die Kondensatorentladezeit
beträgt 5 min!
Ein Fehlerstromschutz-
schalter ist als alleinige
Schutzmaßnahme nicht zulässig!
OHOH
FUNC.
SPEED
Br+
Br-
RS232 interface
for operator
(depending on
built-in operator)
Fitting of braking resistor
(Option), refer to 3.4
Supply connection X4
with integrated filter
Mains filter
Connection PTC X3
without integrated filter
Connection for
electromagnetic brake X5,
see chapter 3.3
Connection PTC X3
with integrated filter