Installing The System Into The Rack By Using The Slide Rails - IBM Power System S822LC Installing The System And Ordered Parts

Hide thumbs Also See for Power System S822LC:
Table of Contents

Advertisement

Figure 5. Latch seated on the front rail of the rack
Note: If you must reposition the rail, release the front latch (2), and while you press the blue pin at
the bottom, push the rail up and toward the rear to release from the rack.
6.
Move to the rear of the rack. Install the screw (3) to secure the slide rail to the rack.
7. Repeat these steps to install the right rail into the rack.

Installing the system into the rack by using the slide rails

Learn how to install the system into the rack by using the slide rails.
About this task
Note: This system requires two people to install the system into the rack.
Procedure
1. Remove the shipping cover on the rear and the front of the system, if present.
2. Extend the slide rails forward (1) until they click twice into place. Carefully lift the server and tilt it
into position over the slide rails so that the rear nail heads (2) on the server line up with the rear slots
(3) on the slide rails. Slide the server down until the rear nail heads slip into the two rear slots. Then,
slowly lower the front of the server (4) until the other nail heads slip into the other slots on the slide
rails. Ensure that the front latch (5) slides over the nail heads.
2
3
1
Figure 6. Extending slide rails and aligning server nail heads with the slots on the rail
3. Lift the blue release latches (1) on the slide rails and push the server (2) all the way into the rack until
it clicks into place. For details, see Figure 7 on page 7.
6
Installing the System and Ordered Parts for the 8335-GCA or 8335-GTA
4
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

8335-gca8335-gta

Table of Contents