Figure 68. Placing the system into the operating position
3. Replace the screws on either side of the system that secure the system to the rack.

Fixed rails

Use this procedure when your system is installed using fixed rails.
Before you begin
CAUTION:
This system requires two people to replace the system into the rack. Do not begin this procedure
unless physical assistance is available to replace the system into the rack.
Note: When placing the system into the operating position, it is essential that all stability plates are
firmly installed to prevent the rack from toppling. Ensure that only one system unit is replaced at a time.
Procedure
1. Position one person on the left side of the system and one person on the right side of the system.
2. Lift the system.
3. Move the system into position over the front of the fixed rack rails.
4. Carefully lower the system until the rear of the system rests on the rails.
5. Push the system all the way into the rack.
6. Using your labels, reconnect the cables at the rear of the system unit.
7. At the front, replace the screws on either side of the system that secure the system to the rack.

Power cords

Learn how to disconnect and connect the power cords on IBM Power System S822LC (8335-GCA and
8335-GTA) systems.
101
Common procedures for servicing or installing features