Connect The Harness To The Can Controls - Raven AutoBoom Case IH Patriot 250 Installation Manual

80'-100' booms
Table of Contents

Advertisement

CONNECT THE HARNESS TO THE CAN CONTROLS

FIGURE 3. AutoBoom Harness Cable Installed
1. Locate the machine's harness cable bulkhead connection in the upper-left corner of the center boom section.
2. Disconnect the machine's cable from the bulkhead connector.
FIGURE 4. AutoBoom Harness Connected to Machine's Harness Connections
3. Install the mating 31-pin connectors of the AutoBoom harness cable (P/N 115-0230-073) on each end of the
machine's harness connections.
P/N 016-0230-047 Rev. C
WIRING INSTALLATION
29

Advertisement

Table of Contents
loading

Table of Contents