ADC Soneplex Broadband System Operation And Maintenance Manual page 49

Adc broadband system operation and maintenance manual
Table of Contents

Advertisement

ADCP-61-471 • Issue 4 • June 2000 • Section 2: Operation and Maintenance
NTP-011
Page 2 of 2
Do Items Below in The Order Listed
7. Clear Alarm History.
8. Enter Target Identifier and set date and time now or during
provisioning (the turn-up process).
9. Configure DS3 MUX as required.
10. Configure RLX or RLXIOR modules as required.
11. Check RLX voltage to repeater.
12. Connect the test equipment at both ends of the system and perform
an end-to-end test.
13. If the DS3 MUX protect module is installed:
Execute Force/APS commands through the Craft Interface.
Perform Manual (Force) Switch to Protect test on DS3 MUX
module.
Perform APS test on DS3 MUX module.
14. At both ends of the circuit, make any necessary cross-connects at
the DSX.
15. Log off from the Craft Interface system.
16. Complete assignment forms and update office records as required
by local procedures.
2-26
© 2000, ADC Telecommunications, Inc.
For Details Go To
DLP-527
DLP-528
DLP-529
DLP-534
or
DLP-533
DLP-567
DLP-522
DLP-537
DLP-511
DLP-512
DLP-569
DLP-564
DLP-523

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Soneplex Broadband System and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF