2. Commissioning
2.1 Preparing the CP system for operation on the
RIO network

2.1.1 Operating voltage

PLEASE NOTE
• The CP field bus node must have a separate

2.1.2 Saving the line assignment

PLEASE NOTE
Before commissioning the CP system you must
first prepare it for commissioning
(see "CP system" manual).
Before commissioning the CP system on the RIO net-
work proceed as follows:
1. Connect the operating voltage of the node (see "CP
2. Connect the CP modules.
3. Switch on the operating voltage.
4. Save the line assignment by pressing the SAVE
5. Switch off the operating voltage for the node.
CP FB8 9809a
operating voltage supply.
system" manual).
button.
2-3