1. Installation
1.2 Display and connecting elements on the field bus node
PLEASE NOTE
The following A-B specific functions have not been
implemented:
- last chassis
- hold last state
- processor restart lockout
CAUTION
Use double solenoid valves if you wish to implement
safety-relevant applications such as "Hold last state"
or "Processor restart lockout" in conjunction with
Festo CP valve terminals.
1-4
CP FB8-E 9809a