Huawei NetCol5000-A021 User Manual page 50

In-row air cooled smart cooling product
Hide thumbs Also See for NetCol5000-A021:
Table of Contents

Advertisement

NetCol5000-A021 In-row Air Cooled Smart Cooling
Product
User Manual (208 V)
Figure 3-14 Cabinet transport tool
(1) Cover bolt
(removed before
installation)
Procedure
Step 1 Remove the cover bolts from one end using a Phillips screwdriver and take down the entire
cover, as shown in
Figure 3-15 Removing cover bolts
Secure the transport tool to the cabinet through the hole near the cabinet door.
Step 2 Wrench an anchor bolt clockwise to elevate a cabinet, insert the end (without a cover) of the
transport tool into the bottom of the cabinet and secure the transport tool to the cabinet, as
shown in
Issue 03 (2020-01-10)
(2) Cover side hole (aligned
with the cabinet mounting hole
during installation)
Figure
3-15.
Figure
3-16.
Copyright © Huawei Technologies Co., Ltd.
3 Installation Guide
(3) Cover side hole (aligned
with the cabinet mounting hole
during installation)
42

Advertisement

Table of Contents
loading

Table of Contents