Conditioner Reel Installation - Landoll VT PLUS 7430 Operator's Manual

Table of Contents

Advertisement

3-12 CONDITIONER REEL INSTALLATION

3-12.1
Install connex bushing into pivot hole of
17" heavy spring (See Figure 3-23).
IMPORTANT
THE CONNEX BUSHING IS LOCATED INSIDE
HEAVY SPRING ASSEMBLY AND MACHINERY
BUSHINGS ARE ASSEMBLED TO OUTSIDE OF
REEL ARM.
3-12.2
Assemble 1 x 8 adjustment bolt through
adjustment pin on frame, 1" lock washer, (2)
1-8 hex nuts, and 17" heavy spring assem-
bly.
3-12.3
Install 1-1/2" flange bearing into reel
arm. Slide in 1-1/2" pivot bushing.
3-12.4
Attach reel arm to upper hole on rear
center or wing frame or double mount using
1-8 x 6-1/2 hex head cap screw and hex lock
nut.
3-12.5
Assemble 17" heavy spring assembly to
reel arm using 1" pivot pin, machinery bush-
ings, and 5/16 x 1-1/2" spring slotted pins.
Set pin centers to 20-3/4" dimension as
shown in Figure 3-23.
WARNING
DO NOT ATTEMPT TO LIFT HEAVY
PARTS (SUCH AS THE FRAME, DISC
GANGS, LIFT, PULL HITCH, OR
REEL/GANG BAR ASSEMBLY MANU-
ALLY. USE A HOIST OR A FORKLIFT
TO MOVE THESE PARTS INTO POSI-
TION.
3-12.6
Attach reel/gang bar assembly to reel
arms using gang bar mount plate, 3/4-10 x 5
hex head cap screws and hex lock nuts. Re-
fer to pages 2-6 - 2-11 for reel/ gang bar
placement locations.
3-31

Advertisement

Table of Contents
loading

Table of Contents