Figure 187 - Dc-Dc J2 And J4 Connections; Figure 188 - Dc-Dc J1 Connection And J12 -J13 Test Points - Danfoss Turbocor VTT Series Service Manual

Variable twin turbo compressors
Table of Contents

Advertisement

Figure 187 - DC-DC J2 and
J4 Connections
M4 Ground
Figure 188 - DC-DC J1
Connection and J12 -J13
Test Points
OEM Module Components
J7 Connector
J4 Connector
4. Disconnect the grounding wires from M4, M5, J6, and J7.
5. Remove the securing hardware holding the DC-DC frame to the panel.
6. Remove the DC-DC from the panel.
Removal (Revisions C and Later):
1. Isolate the VFD power as described in the
this manual.
2. Open the panel containing the DC-DC. Verify the HV DC input from VFD is below 5 VDC by
checking at VDC+ (J12) and VDC- (J13) test points on DC-DC with a DC voltage meter.
3. Disconnect the HV DC input cable from J1; 24 VDC output cable from J4; and 250 VDC output
cable from J2.
J12 Connector
J13 Test Point
J6 Connector
J2 Connector
"Electrical Isolation of the Compressor/VFD"
M-SV-VT-001-EN Rev. A
M5 Ground
section of
145 of 165

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Turbocor VTT Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents