Booster
E.2 Mounting a booster
B. Mounting the pressure gauge and connection block
1. Check whether the O-rings are in the pressure gauge block. There are two O-rings in the
single-acting version. There are three O rings in the double-acting version.
2. Fasten the pressure gauge block
screws, do not tighten them.
3. Fasten the connection block
the screws, do not tighten them.
304
⑥
with the screws
⑨
⑩
with the screws
,
Operating Instructions, 11/2019, A5E00074631-AE
⑦
⑧
and lock washers
⑫
⑪
and lock washers
SIPART PS2 with 4 to 20 mA/HART
. Position the
⑬
,
. Position