Running-In Instructions - Fayat BOMAG BT 60 Operating And Maintenance Instructions Manual

Vibratory tamper
Table of Contents

Advertisement

6.4 Running-in instructions

The following maintenance work must be performed when
running in new machines or overhauled engines:
NOTICE!
During the running-in period, up to approx. 200 oper-
ating hours, check the engine oil level twice every day.
Depending on the load the engine is subjected to, the
oil consumption will drop to the normal level after
approx. 100 to 200 operating hours.
After approx. 25 operating hours
Change the engine oil.
Check the idel speed and the max. speed of the engine,
adjust if necessary.
Check engine and machine for leaks.
Retighten the fastening screws on air filter exhaust, fuel tank
and other attachments.
Retighten the bolted connections on the machine.
BT 60 / BT 65
Maintenance
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bomag bt 65

Table of Contents