Maintenance – Running-in instructions
8.4 Running-in instructions
8.4.1 General
8.4.2 After 25 operating hours
68
The following maintenance work must be performed when running
in new machines or overhauled engines.
1.
Change the engine oil
oil' on page 75.
2.
Check engine and machine for leaks.
3.
Retighten the fastening screws on air filter, exhaust and other
attachments.
4.
Retighten the bolted connections on the machine.
5.
Checking the V-belt
on page 78.
6.
Check the oil level in the vibrator housing
'Checking the oil level in the exciter housing' on page 78.
BP 25/50
Ä Chapter 8.8.1 'Changing the engine
Ä Chapter 8.8.5 'Servicing the V-belt'
Ä Chapter 8.8.4