Running-In Instructions - Fayat BOMAG BT 60/4 Operating And Maintenance Instructions Manual

Table of Contents

Advertisement

BT 60/4, BT 65/4
6.4

Running-in instructions

The following maintenance work must be per-
formed when running in new machines or
overhauled engines:
Caution
!
During the running-in period, up to approx. 200
operating hours, check the engine oil level
twice every day.
Depending on the load the engine is subjected
to, the oil consumption will drop to the normal
level after approx. 100 to 200 operating hours.
After approx. 25 operating hours
Change the engine oil.
l
Check the idel speed and the max. speed of
l
the engine, adjust if necessary.
Check engine and machine for leaks.
l
Retighten the fastening screws on air filter ex-
l
haust, fuel tank and other attachments.
Retighten the bolted connections on the ma-
l
chine.
BOMAG
Maintenance
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bomag bt 65/4

Table of Contents