Apply Power To Switch; Verify Switch Operations - Allied Telesis IS Series Installation Manual

Industrial ethernet layer 2 switch
Hide thumbs Also See for IS Series:
Table of Contents

Advertisement

Chapter 5: Power On Switch

Apply Power To Switch

Verify Switch
Operations
76
This section contains the procedure for powering on the switch.
To power on the chassis, perform the following procedure:
1. Apply power to the DC power supplies.
Note
The IS230-10GP switch does not have an On/Off switch. To turn the
unit OFF, you must turn OFF the power supplies.
2. Wait a minimum of one minute for the switch to initialize its operating
system.
Here are items to check to verify that the switch is operating normally. If
there is a problem, refer to Chapter 6, "Troubleshooting" on page 79 for
suggestions on how to resolve it.
The Fault LED should be off.
One or both PWR 1 and PWR 2 LEDs should be solid green,
depending on the number of DC power supplies connected to the
unit.
The LEDs on SFP slots with transceivers connected to active
network devices should be solid or flashing green.
The Link LEDs on twisted-pair ports connected to active network
devices should be solid or flashing green or amber. The Link LEDs
are identified in Figure 5 on page 36 and Figure 6 on page 37.
The PoE LEDs should be solid green on ports that are connected
to PoE or PoE+ devices. The PoE LEDs are identified in Figure 7
on page 37.
After verifying the operations of the switch, go to "Start Local Management
Session" on page 77.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is230-10gp

Table of Contents