Allied Telesis IS Series Installation Manual page 70

Industrial ethernet layer 2 switch
Hide thumbs Also See for IS Series:
Table of Contents

Advertisement

Chapter 5: Power On Switch
5. Connect the other end of the ground wire to an earth-ground point at
the installation site.
6. Go to "Power/Alarm Connector Cables" on page 71.
70

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is230-10gp

Table of Contents