Figure 11: Pre-Installed Components On The Top Panel; Figure 12: Pre-Installed Din Rail Bracket On The Back Panel - Allied Telesis IS Series Installation Manual

Industrial ethernet layer 2 switch
Hide thumbs Also See for IS Series:
Table of Contents

Advertisement

The Power/Alarm connector and the grounding screw locations are
identified in Figure 11.
1
2
Figure 11. Pre-installed Components on the Top Panel
Figure 12 identifies the pre-installed DIN rail bracket on the back panel.
One DIN rail bracket
Figure 12. Pre-installed DIN Rail Bracket on the Back Panel
IS230-10GP Industrial Ethernet Layer 2 Switch Installation Guide
One M4x8 Phillips-head
grounding screw with
star washer
One 6-pin connector on the
DC power PWR 1, PWR 2 and
P-Fail connector
1
2
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is230-10gp

Table of Contents