Figure 19: Mark Wall Bracket Hole Locations - Allied Telesis IS Series Installation Manual

Industrial ethernet layer 2 switch
Hide thumbs Also See for IS Series:
Table of Contents

Advertisement

Chapter 3: Install the Switch
58
4. Hold the switch on the concrete or masonry wall or industrial panel at
the selected location for the device while you use a pencil or pen to
mark the locations of the four screw holes in the two wall brackets.
Refer to Figure 19.
Please follow these guidelines as you position the switch on the wall or
industrial panel:
The switch must be oriented as shown in Figure 19. You may not
install the switch horizontally or upside-down.
Be sure to leave sufficient space from other devices or walls to
allow for adequate air circulation around and through the cooling
fins. Refer to "Review Site Requirements" on page 48 for further
information.
Figure 19. Mark Wall Bracket Hole Locations

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is230-10gp

Table of Contents