Preparing The Connection Block - Festo VIFB-02- Series Manual

Valve terminal/valve sensor terminal with field bus connection
Hide thumbs Also See for VIFB-02- Series:
Table of Contents

Advertisement

VIFB1 – 02
5/3
Connections
for common
hoses
(adhesive
3/5
foil)
Connection for common hoses
Unilateral
Bilateral
Fig. 4/3: Connections on the sub-base
4-8
> IFB1-02_BES_V_018474g1_1996-04N - Restored Document - 2011-12-15 <
4. Installation

Preparing the connection block

Connections for common lines are provided on
both sides of the connection block. The common
lines can therefore be fitted either on the right or
the left, depending on individual requirements.
To increase the air flow we recommend that the
lines for compressed air supply and ventilation
be connected on both sides in the following ca-
ses:
• When the valve terminal/valve sensor termi-
nal has more than 10 valves (rated supply
pressure 6 bar)
• With large-volume actuators
The connections should be made in accordance
with the table below:
1
Procedure
Remove all adhesive foil as late as possible
Fit blind plugs unilaterally
Remove all adhesive foil and blind plugs
Connections
for common
hoses (blind
plugs)
9604

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents