VIFB1 - 02
COMMISSIONING
Configuring the PLC
> IFB1-02_BES_V_018474g1_1996-04N - Restored Document - 2011-12-15 <
9604
5. Commissioning
Before commissioning or programming, the user
should compile a configuration list for the con-
nected field bus slaves. On the basis of this list:
• a comparison can be made between ACTUAL
and NOMINAL configurations in order that in-
correct connections can be avoided;
• access can be made to specifications during
a syntax check of a program in order that
addressing errors can be avoided.
5-3