Hardware Installation and Setup
WARNING! Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
AltaBlue melters are factory‐configured for each order and require only the
assembly and set up tasks described in this section.
The melter is shipped from the factory with an installation kit that contains
components that must be assembled onto the melter by the customer. Some
additional materials must also be supplied by the customer to complete the
installation.
If optional equipment was ordered with the melter, refer to the documentation
provided with the optional equipment for installation and operating
instructions.
This section presents installation procedures in their most commonly used
form. Procedural variations or special considerations are explained in the
additional information table that follows most procedures. Where applicable,
some table entries also contain cross‐reference information. Additional
information tables are indicated by the symbol shown to the left.
Hardware Installation and Setup
Section 3
3-1
Part 1120130