Ventilation; Electrical Power - Nordson AltaBlue Customer Product Manual

Touch adhesive melters
Table of Contents

Advertisement

3-6
Hardware Installation and Setup

Ventilation

Electrical Power

Part 1120130
AltaBlue melters are cooled by forced air. Air is drawn in through by the
ventilation fan and is exhausted out of the ventilation slots at the top of the
melter.
CAUTION! Do not block the fan air intake openings or the exhaust ventilation
slots.
Figure 3-4
Location of the ventilation openings
Before installing the melter, ensure that the melter will not be overloaded and
that the plant's electrical service is rated to handle the power required by the
melter and the hoses and applicators that you plan to use.
Refer to Appendix A, Calculating Melter Power Requirements, for information
about how to calculate the maximum allowable hose lengths and applicator
wattages that can be used in your manufacturing application.
WARNING! Risk of electrocution! Install a lockable power disconnect switch
between the electrical service and the melter. Failure to install or properly
use the disconnect switch when servicing the melter can result in personal
injury, including death.
E 2011 Nordson Corporation

Advertisement

Table of Contents
loading

Table of Contents