Chapter 10
Powering on the NetBackup
5220
Check before powering on
This section provides information that needs to be checked after the hardware
installation and cable connections are completed, but before the device is powered
on.
Verify that the device and cables are installed correctly. The following table
provides instructions for checking device installation.

Installation confirmation

Component
NetBackup 5220
AC power cables
Before checking the device installation and cable connections, confirm that all
power to the NetBackup 5220 is turned off to prevent personnel injuries or
device damage.
Correct Installation
The NetBackup 5220 is placed securely
in the rack cabinet.
The AC power cables of the NetBackup
5220 are connected securely between the
power modules of the device and the
main AC power supply.
Incorrect Installation
The NetBackup 5220 is slanted
or loose within the rack cabinet.
Only one power cable is
connected to the device.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NetBackup 5220 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Storage shelf

Table of Contents