40
Chapter 4
Installation requirements
Installation checklist
Installation checklist
Installation checklist
In addition, make sure that the following special requirements are met:
Item
Requirement
Facility
The floor meets load-bearing requirements. Wiring troughs, ladders,
preparation
and holes are ready. All construction is complete.
Air
If the temperature in the room may exceed 35°C, install air
conditioning
conditioners which can be restarted upon recovery from a power
failure. Do not let the air conditioner blow directly on the devices.
Moisture
If the relative humidity is greater than 70%, a dehumidifying device
proofing
(for example, an air conditioner that provides a dehumidification
function or a special-purpose dehumidifier) needs to be installed.
Water penetration, dripping, and condensation must all be prevented
in the equipment room.
Heating
If the temperature in the room will be lower than the stated minimum
of 10°C, heating devices are required.
Dust proof
If the equipment room is located near a potential source of dust or
other particulate matter, a double aluminum alloy window and an
anti-theft fire door must be installed. The devices must be separated
from the door and a baffle must be used to prevent dust pollution.
Lightning
The equipment room must have a lightning protection device such as
strike
lightning rod or lightning strip. The grounding of the lightning
protection
protection device and the protective grounding of the equipment
room must share a grounding body.
Before installation, check whether you need to submit a qualification
certificate of the installation company to the property management in
charge of the installation site.
Before transportation, ensure that the dimensions of the devices meet
the requirements of the transportation passages (such as elevators
and passageways).