2.4.5 CONNECTION OF THE EXTERNAL PELLET TANK

The boiler is equipped by a motor for vacuum pellet feeding from an external tank. The external
tank can be placed nearby the boiler or in another room. The max. length of the suction tube is
10 m. The tank can be in the higher position, but not in the lower position than the boiler. It is
recommended to use the ATTACK vacuum tanks for the ATTACK WOOD&PELLET boiler. The
suction tubes (  50 mm) and the vacuum tank can be ordered as accessories together with the
boiler.
Connection of the suction and blow out tube marked on the rear side boiler as „PELLET IN"and
„PELLET OUT".

2.4.6 LEFT DOOR VERSION

There is an option of the ATTACK WOOD&PELLET boiler with the left door (door hinges on the
left side). It can be done before the boiler start-up or later, when the boiler is not in service. The
main, upper, middle and bottom door can be turned without need of the any additional tools.
Everything necessary is contained in the boiler. Use the standard tools: cross screwdriver, fork
key of 8–13 mm or nut, allan key of 6 mm, etc. The adjustment has to be done by a trained
worker.
2.4.7 CHOICE AND WAY OF CONNECTION OF THE CONTROL AND SAFETY
ELEMENTS
The boiler is delivered with the basic regulation and control equipment. This equipment must be
completed with other items (not delivered with the boiler) in line with local regulations, that
have to be installed in the heating circuit – particularly the following ones: safety valve (Pic. 4)
against exceeding the permitted pressure in the heating system (prescribed value: 2,5 bar), valve
of the boiler aftercooling loop to take the excessive heat from the boiler into the waste and
deaeration valve for the correct boiler function. The volume of the expanse vessel in the system
has to be defined by a designer of the heating system according to the system design and local
regulations. The electrical installation related to the additional boiler equipment has to be done
by a specialist and following the valid regulations.
DANGER
The heating system must be equipped with a safety valve against
exceeding the pressure in the boiler (2,5 bar). This valve should
be placed on the flow connection of the boiler, always installed in
front of the boiler closing valve (or in front of the Oventrop –
scheme 1). If the safety valve is not functional, the excessive
pressure will not be eliminated and it may cause an explosion
of the boiler.
Pic. 4 Safety valve against the overpressure