Check List; Installation Check List - Siemens SINAMICS G110D Series Getting Started

Distributed converter
Hide thumbs Also See for SINAMICS G110D Series:
Table of Contents

Advertisement

Check List

4.1

Installation check list

Installation check list
Before power is applied to the inverter/motor system, the following checks should be
performed:
Check that:
1
The environmental conditions conform to the inverter/motor specifications
2
The inverter and the motor are securely mounted
3
The inverter and motor are correctly installed with adequate cooling provision
4
The motor and the application/equipment are ready to start, i.e. safe state - motor can rotate
5
The inverter is correctly earthed/grounded
6
The input power (supply) voltage matches the inverter's nominal input voltage
7
The input power (mains) fuses are the correct type and installed correctly
8
The motor connections are connected to ensure the correct direction of rotation of the motor at start-up
9
The motor and mains connections are connected and tightened to the required specification
10
The motor cable is routed away from other cables
11
The control connections are connected and tightened to the required specification
12
No tools or other objects that can cause damage to the system are present
13
The inverter is the only power source to the motor
SINAMICS G110D
Getting Started, 07/2016, FW V3.63, A5E38556288B AA
4
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents