Commissioning
5.1 Commissioning with STARTER
Image 5-5
Using the order number of the Inverter, select the appropriate Inverter power unit.
Press "next" to display the summary screen.
Image 5-6
The summary screen displays the configuration settings that have been completed up to this
point of the process. The details of the configuration can be copied to the clipboard and
44
Select power unit dialog
Summary dialog
Getting Started, 07/2016, FW V3.63, A5E38556288B AA
SINAMICS G110D