CGC 200 installation and commissioning
instructions 4189340806 UK
2.2.5 Connecting the terminals
The wiring is connected to the controller terminals using pull-apart PCB terminal blocks.
For the MPU input, a magnetic head signal input and a shielding line are recommended.
Protect the controller terminals from static discharge during installation.
For safety reasons, the work must be carried out by qualified personnel.
To connect the terminals:
1. Connect each wire to the correct connection on the terminal block, then tighten the screw using a flat-
bladed screwdriver.
2. Make sure that the removable part of the terminal block is pressed all the way into the terminal block on
the CGC 200.
DEIF A/S
Installation
Page 9 of 32