CGC 200 installation and commissioning
instructions 4189340806 UK
1. Double click the Utility Software shortcut icon (
will open.
2. The first time you use the Utility Software, you need to set up the connection to the CGC 200:
DEIF does not recommend using the PC USB as the primary power supply for the CGC
200. The power drawn on start up exceeds the USB standard and may damage the PC.
1. Use the USB cable to connect the CGC 200 to the PC. The CGC 200 Power OK LED should light up.
2. If the Settings dialogue box does not open automatically, select File, then click Settings. Alternative-
ly, press F3, or click the Settings icon (
3. Under Communication, in the Communication type field, select Service port. The other communica-
tion types are not relevant for CGC 200.
4. In the Communication port drop-down list, select the port that indicates that the CGC 200 is present,
as indicated above. If no ports indicate the CGC 200, check the connection and click Scan ports.
5. Click OK.
3. If you already have a connection set up, select Connection from the menu, then click Connect. Alterna-
tively, press F5.
After successful connection, a Device page opens (see example below). The Device page shows the current
status of the device, the type of device, the connection status, the device software version, and so on.
DEIF A/S
) on your desktop. The Utility Software program
) on the toolbar.
Commissioning
Page 20 of 32