Festo CPX-FB14 Electronic Manual page 51

Cpx terminal
Hide thumbs Also See for CPX-FB14:
Table of Contents

Advertisement

2. Commissioning
Contents of this chapter
Further information
Festo P.BE−CPX−FB14−E N en 0308a
In this chapter you will find information on commissioning the
CPX terminal on the CANopen:
configuration and addressing on a CANopen master, ob
ject directories
You can adapt the reaction of the CPX terminal to the rel
evant requirements by parametrizing it. This enables e.g.
the setting of debounce times, signal lengthening or the
reaction to faults.
Before commissioning you must install the CPX terminal cor
rectly. Information on this can be found in chapter 1.
General information on commissioning CPX terminals as well
as a detailed description of the individual parameters can be
found in the CPX system manual (P.BE−CPX−SYS−..).
Information on commissioning the pneumatic interface and
I/O modules can be found in the manual for the CPX I/O mod
ules (P.BE−CPX−EA−..).
Instructions on commissioning the pneumatic components
can be found in the relevant pneumatics manual
(see Tab. 0/1).
2−3

Advertisement

Table of Contents
loading

Table of Contents