Bosch ICP-MAP5000-2 Installation Manual page 39

Hide thumbs Also See for ICP-MAP5000-2:
Table of Contents

Advertisement

MAP5000
Figure 3.1 Data Bus Connections of the System Modules on the Internal BDB
Notice!
The order of system modules on the BDB shown in the figure is not mandatory. A symmetrical
load distribution to the power supply outputs A and B must be ensured as far as possible.
Figure 3.2 Data Bus Cable Routing
Bosch Sicherheitssysteme GmbH
120 Ω
Installation Manual
Cable Connections | en
39
2014.12 | 13 | F.01U.168.332

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map5000 seriesIcp-map5000-com

Table of Contents