10.1.1 Changing the pump tubing
Aggressive condensate possible!
Media residues in tubing!
WARNING
Chemical burns caused by aggressive media possible!
Wear protective clothing and glasses!
When sending the peristaltic pump to M&C customer service for
repair, please indicate the type of medium pumped. Before shipping
Note
the pump, please remove hazardous or aggressive contaminations
from all parts of the pump!
1
Fig. 39: Changing the pump tubing
1
conveying belt
3
tubing
For changing the pump tubing please proceed as follows:
Unplug the cooler from the mains voltage. The device needs to be voltage
free.
Open tube connections at the pump; press conveying belt
grips and turn S-bolt
Remove conveying belt
of the guides;
Press the two contact pulleys
sufficient, if not, the contact springs have to be changed (see chapter 7.4.1 on
page 20).
Put the new tubing
1
belt
;
59
EC-30C | 1.00.02
4
2
S-bolt
4
contact pulley
2
clockwise up to limit stop;
1
and pull the old tubing
4
and check whether the spring pressure is still
3
with the tube bushing into the guides of the conveying
+49 2102 935 888
2
3
1
at the recessed
3
at the tube bushings out
www.mc-techgroup.com
Need help?
Do you have a question about the EC-30C and is the answer not in the manual?