Figure 1 Binding mounting kits for the RRU
(1) Lifting sling
3. Installation engineer A catches the mounting kits and then unties the slings.
4. Install the mounting kits. For detailed operations, see steps 1 to 3 in
5. Installation engineer C binds the RRU using the lifting sling and traction sling, as shown in
. The binding methods in
Figure 2
Figure 2 Binding the RRU
(2) Traction sling
and
are incorrect.
Figure 3
Figure 4
.
Installing a Single RRU
Need help?
Do you have a question about the RRU5909 and is the answer not in the manual?
Questions and answers